Dumpster / apron pad
$11.86 / SF
CN-020 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing and finishing a dumpster or apron pad. The mason places ready-mix and finishes the pad face. The rate is per square foot of pad. Excavation and base, edge forms, bollards, and an equipment pad billed as its own unit are separate.
Includes
- Ready-mix for a dumpster or apron pad
- Place, screed, and finish the pad
- Small tools
Excludes
- Excavation and base
- Edge forms
- Bollards
- Equipment pad billed as its own unit
Build-up
- Labor 0.12 hr × $48.00 wage and burden
- $5.76
- Material and small tools
- $4.04
- Direct rate (labor, material, and tools)
- $9.80 / SF
- Overhead 10% of direct
- $0.98
- Fee 10% of (direct and overhead)
- $1.08
- Loaded rate
- $11.86 / SF