Elevator pit floor
$14.62 / SF
CN-151 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing and finishing one square foot of concrete elevator-pit floor on prepared base. The cement mason places, screeds, and finishes the floor. Excavation, reinforcement, pit walls, waterproofing, drains, embeds, and testing are separate units.
Includes
- ready-mix concrete
- finish and curing-material allowance
- place, screed, and finish pit floor
- small tools
Excludes
- excavation
- subgrade
- reinforcing steel
- pit walls
- waterproofing
- sump and drains
- embeds
- testing
Build-up
- Labor 0.145 hr × $48.00 wage and burden
- $6.96
- Material and small tools
- $5.12
- Direct rate (labor, material, and tools)
- $12.08 / SF
- Overhead 10% of direct
- $1.21
- Fee 10% of (direct and overhead)
- $1.33
- Loaded rate
- $14.62 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
