Elevator pit floor

$14.62 / SF

CN-151 · MasterFormat 03 30 00 · SF

What’s in this rate

This unit is placing and finishing one square foot of concrete elevator-pit floor on prepared base. The cement mason places, screeds, and finishes the floor. Excavation, reinforcement, pit walls, waterproofing, drains, embeds, and testing are separate units.

Includes

  • ready-mix concrete
  • finish and curing-material allowance
  • place, screed, and finish pit floor
  • small tools

Excludes

  • excavation
  • subgrade
  • reinforcing steel
  • pit walls
  • waterproofing
  • sump and drains
  • embeds
  • testing

Build-up

Labor 0.145 hr × $48.00 wage and burden
$6.96
Material and small tools
$5.12
Direct rate (labor, material, and tools)
$12.08 / SF
Overhead 10% of direct
$1.21
Fee 10% of (direct and overhead)
$1.33
Loaded rate
$14.62 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.