Sonotube pier pour
$27.18 / CF
CN-152 · MasterFormat 03 30 00 · CF
What’s in this rate
This unit is placing one cubic foot of concrete in a prepared fiber tube pier form. The cement mason places, consolidates, and finishes the pier top. Excavation, tube setup beyond the allowance, reinforcement, anchors, and testing are separate units.
Includes
- ready-mix concrete
- fiber tube-form allowance
- place, consolidate, and finish pier
- small tools
Excludes
- excavation and drilling
- reinforcing steel
- anchors and embeds
- tube installation beyond allowance
- pump mobilization
- testing
Build-up
- Labor 0.28 hr × $48.00 wage and burden
- $13.44
- Material and small tools
- $9.02
- Direct rate (labor, material, and tools)
- $22.46 / CF
- Overhead 10% of direct
- $2.25
- Fee 10% of (direct and overhead)
- $2.47
- Loaded rate
- $27.18 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
