Elevator pit wall form

$19.16 / LF

CN-181 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is forming one linear foot of elevator pit wall at a prepared pit. The cement mason cuts, aligns, braces, and strips the pit-wall form. Concrete placement, pit floor, waterproofing, and elevator equipment are separate units.

Includes

  • reusable pit-wall form-panel and lumber
  • ties, braces, and release agent
  • cut, align, brace, and strip pit-wall form
  • small tools

Excludes

  • concrete placement
  • pit floor slab
  • waterproofing
  • elevator equipment
  • stem wall form

Build-up

Labor 0.22 hr × $48.00 wage and burden
$10.56
Material and small tools
$5.28
Direct rate (labor, material, and tools)
$15.84 / LF
Overhead 10% of direct
$1.58
Fee 10% of (direct and overhead)
$1.74
Loaded rate
$19.16 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.