Elevator pit wall form
$19.16 / LF
CN-181 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is forming one linear foot of elevator pit wall at a prepared pit. The cement mason cuts, aligns, braces, and strips the pit-wall form. Concrete placement, pit floor, waterproofing, and elevator equipment are separate units.
Includes
- reusable pit-wall form-panel and lumber
- ties, braces, and release agent
- cut, align, brace, and strip pit-wall form
- small tools
Excludes
- concrete placement
- pit floor slab
- waterproofing
- elevator equipment
- stem wall form
Build-up
- Labor 0.22 hr × $48.00 wage and burden
- $10.56
- Material and small tools
- $5.28
- Direct rate (labor, material, and tools)
- $15.84 / LF
- Overhead 10% of direct
- $1.58
- Fee 10% of (direct and overhead)
- $1.74
- Loaded rate
- $19.16 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
