Post-tension stress
$18.80 / EA
CN-182 · MasterFormat 03 30 00 · EA
What’s in this rate
This unit is stressing one post-tension tendon at a prepared slab or member. The cement mason seats wedges, stresses to the specified force, and records elongation. Tendon placement, ducts, concrete pour, and grouting are separate units.
Includes
- stressing-head and wedge allowance
- grout-port and consumable allowance
- seat, stress, and record elongation
- small tools
Excludes
- tendon and duct placement
- concrete pour
- grouting
- engineering calibration
- testing beyond elongation log
Build-up
- Labor 0.25 hr × $48.00 wage and burden
- $12.00
- Material and small tools
- $3.54
- Direct rate (labor, material, and tools)
- $15.54 / EA
- Overhead 10% of direct
- $1.55
- Fee 10% of (direct and overhead)
- $1.71
- Loaded rate
- $18.80 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
