Post-tension stress

$18.80 / EA

CN-182 · MasterFormat 03 30 00 · EA

What’s in this rate

This unit is stressing one post-tension tendon at a prepared slab or member. The cement mason seats wedges, stresses to the specified force, and records elongation. Tendon placement, ducts, concrete pour, and grouting are separate units.

Includes

  • stressing-head and wedge allowance
  • grout-port and consumable allowance
  • seat, stress, and record elongation
  • small tools

Excludes

  • tendon and duct placement
  • concrete pour
  • grouting
  • engineering calibration
  • testing beyond elongation log

Build-up

Labor 0.25 hr × $48.00 wage and burden
$12.00
Material and small tools
$3.54
Direct rate (labor, material, and tools)
$15.54 / EA
Overhead 10% of direct
$1.55
Fee 10% of (direct and overhead)
$1.71
Loaded rate
$18.80 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.