Wash-rack housekeeping pad
$17.67 / SF
CN-174 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing one square foot of wash-rack housekeeping pad at a prepared equipment location. The cement mason forms, places, slopes, and finishes the pad. Excavation, drain piping, equipment anchors, and coatings are separate units.
Includes
- ready-mix concrete and form allowance
- slope and drain-pocket allowance
- place, slope, and finish wash-rack pad
- small tools
Excludes
- excavation
- drain piping
- equipment anchors
- coatings
- waterproofing
Build-up
- Labor 0.17 hr × $48.00 wage and burden
- $8.16
- Material and small tools
- $6.44
- Direct rate (labor, material, and tools)
- $14.60 / SF
- Overhead 10% of direct
- $1.46
- Fee 10% of (direct and overhead)
- $1.61
- Loaded rate
- $17.67 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
