Hydrodemolition prep

$5.60 / SF

CN-104 · MasterFormat 03 01 00 · SF

What’s in this rate

This unit is preparing one square foot of concrete face by controlled hydrodemolition for a follow-on repair. The cement mason removes unsound material and leaves a clean, sound substrate. Water management, repair concrete, disposal, and engineering are separate units.

Includes

  • hydrodemolition consumable/equipment share
  • remove unsound face and expose substrate
  • small tools

Excludes

  • repair concrete
  • rebar replacement
  • water collection/disposal
  • containment
  • engineering

Build-up

Labor 0.07 hr × $48.00 wage and burden
$3.36
Material and small tools
$1.27
Direct rate (labor, material, and tools)
$4.63 / SF
Overhead 10% of direct
$0.46
Fee 10% of (direct and overhead)
$0.51
Loaded rate
$5.60 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.