Mat foundation place
$22.01 / CF
CN-074 · MasterFormat 03 31 00 · CF
What’s in this rate
This unit is placing one cubic foot of mat or raft foundation concrete. The cement mason places, consolidates, and finishes the mat pour ready for cure. The rate is per cubic foot of placed concrete. Spread footings, pile caps, and vapor barrier are separate units.
Includes
- ready-mix concrete with 5% waste
- form edge share amortized
- place, consolidate, and finish
- small tools
Excludes
- spread footing (buy concrete-spread-footing)
- pile cap (buy concrete-pile-cap)
- vapor barrier / rebar
- excavation / after-hours
Build-up
- Labor 0.22 hr × $48.00 wage and burden
- $10.56
- Material and small tools
- $7.63
- Direct rate (labor, material, and tools)
- $18.19 / CF
- Overhead 10% of direct
- $1.82
- Fee 10% of (direct and overhead)
- $2.00
- Loaded rate
- $22.01 / CF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
