Metal pan deck fill
$7.07 / SF
CN-078 · MasterFormat 03 30 00 · SF
What’s in this rate
This unit is placing one square foot of concrete fill in a metal pan deck. The cement mason places, consolidates, and finishes the deck fill ready for cure. The rate is per square foot of deck face. Stair pan fill densify and structural slab place are separate units.
Includes
- ready-mix concrete for typical pan fill thickness with 5% waste
- place, consolidate, and finish
- small tools
Excludes
- stair pan fill densify (buy concrete-stair-pan-fill)
- metal deck supply/install
- rebar / shear studs
Build-up
- Labor 0.09 hr × $48.00 wage and burden
- $4.32
- Material and small tools
- $1.53
- Direct rate (labor, material, and tools)
- $5.85 / SF
- Overhead 10% of direct
- $0.58
- Fee 10% of (direct and overhead)
- $0.64
- Loaded rate
- $7.07 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
