Integral topping

$4.30 / SF

CN-079 · MasterFormat 03 35 00 · SF

What’s in this rate

This unit is producing one square foot of integral concrete topping finish on flatwork. The concrete finisher works the integral topping into the plastic surface to a uniform finish face. The rate is per square foot of topped face. Dry-shake hardener, stained concrete, and steel trowel finish are separate units.

Includes

  • integral topping material share with 5% waste
  • work-in and finish pass
  • small tools

Excludes

  • dry-shake hardener densify
  • stained concrete (buy concrete-stained-floor)
  • steel trowel finish-only (buy concrete-steel-trowel-finish)
  • slab place

Build-up

Labor 0.055 hr × $46.00 wage and burden
$2.53
Material and small tools
$1.02
Direct rate (labor, material, and tools)
$3.55 / SF
Overhead 10% of direct
$0.36
Fee 10% of (direct and overhead)
$0.39
Loaded rate
$4.30 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.