Integral topping
$4.30 / SF
CN-079 · MasterFormat 03 35 00 · SF
What’s in this rate
This unit is producing one square foot of integral concrete topping finish on flatwork. The concrete finisher works the integral topping into the plastic surface to a uniform finish face. The rate is per square foot of topped face. Dry-shake hardener, stained concrete, and steel trowel finish are separate units.
Includes
- integral topping material share with 5% waste
- work-in and finish pass
- small tools
Excludes
- dry-shake hardener densify
- stained concrete (buy concrete-stained-floor)
- steel trowel finish-only (buy concrete-steel-trowel-finish)
- slab place
Build-up
- Labor 0.055 hr × $46.00 wage and burden
- $2.53
- Material and small tools
- $1.02
- Direct rate (labor, material, and tools)
- $3.55 / SF
- Overhead 10% of direct
- $0.36
- Fee 10% of (direct and overhead)
- $0.39
- Loaded rate
- $4.30 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
