Perimeter wall form

$17.69 / SF

CN-213 · MasterFormat 03 11 00 · SF

What’s in this rate

This unit is forming one square foot of concrete perimeter-wall face at a prepared wall line. The cement mason cuts, aligns, braces, and strips forms for the perimeter-wall assembly. Concrete placement, reinforcing steel, waterproofing, and engineered shoring are separate units.

Includes

  • reusable form-face and lumber allowance
  • ties, braces, and fasteners
  • cut, align, brace, and strip perimeter-wall form
  • small tools

Excludes

  • concrete placement
  • reinforcing steel
  • engineered shoring
  • waterproofing
  • drainage
  • embeds

Build-up

Labor 0.22 hr × $48.00 wage and burden
$10.56
Material and small tools
$4.06
Direct rate (labor, material, and tools)
$14.62 / SF
Overhead 10% of direct
$1.46
Fee 10% of (direct and overhead)
$1.61
Loaded rate
$17.69 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.