Slab edge form

$7.83 / LF

CN-048 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting one linear foot of slab edge form for commercial flatwork. The cement mason sets, aligns, and braces the edge form ready for pour. The rate is per linear foot of edge. Form strip after pour, full edge form set-and-strip package, and slab place are separate units.

Includes

  • form lumber / forms share with 5% waste
  • set, align, and brace edge form
  • small tools

Excludes

  • strip after pour if priced separate
  • full set-and-strip package (buy concrete-form-edge)
  • slab place
  • keyway form (buy concrete-keyway-form)

Build-up

Labor 0.095 hr × $48.00 wage and burden
$4.56
Material and small tools
$1.91
Direct rate (labor, material, and tools)
$6.47 / LF
Overhead 10% of direct
$0.65
Fee 10% of (direct and overhead)
$0.71
Loaded rate
$7.83 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.