Trench drain form
$14.65 / LF
CN-113 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of formwork for a prepared commercial trench drain. The cement mason cuts, aligns, braces, and secures the form profile ready for concrete placement. Drain body, excavation, concrete, and grates are separate units.
Includes
- trench-drain form share with 5% waste
- braces and fasteners
- cut, align, brace, and secure forms
- small tools
Excludes
- drain body
- grate
- excavation
- concrete placement
- rebar
- testing
Build-up
- Labor 0.15 hr × $48.00 wage and burden
- $7.20
- Material and small tools
- $4.91
- Direct rate (labor, material, and tools)
- $12.11 / LF
- Overhead 10% of direct
- $1.21
- Fee 10% of (direct and overhead)
- $1.33
- Loaded rate
- $14.65 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
