Drywall control joint
$4.90 / LF
Drywall control joint costs about $4.90 per linear foot installed. This is a published starting point and varies by region and job.
DW-042 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of drywall control joint accessory on hung gypsum. The drywall crew cuts and sets the control joint then embeds it and applies the finish coats and sanding over the bead. The rate is per linear foot of joint. Corner bead, J/L bead and wall-field tape-and-finish are separate units.
Includes
- drywall control joint accessory with 5% waste
- fasteners
- cut, set, and secure
- embed coat, finish coats, and sanding over the bead (finish-ready to Level 4)
- small tools
Excludes
- metal corner bead (buy drywall-corner-bead-metal)
- J-bead / L-bead
- wall-field tape and finish (tape-and-finish level unit)
Build-up
- Labor 0.065 hr × $51.00 wage and burden
- $3.32
- Material and small tools
- $0.73
- Direct rate (labor, material, and tools)
- $4.05 / LF
- Overhead 10% of direct
- $0.41
- Fee 10% of (direct and overhead)
- $0.44
- Loaded rate
- $4.90 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
