Metal corner bead

$6.77 / LF

DW-034 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of metal outside corner bead on hung gypsum. The carpenter cuts and sets the bead ready for finish coats. The rate is per linear foot of bead. J-bead, L-bead, shadow bead, and tape-and-finish are separate units.

Includes

  • metal outside corner bead with 5% waste
  • fasteners / embed share
  • cut, set, and secure bead
  • small tools

Excludes

  • J-bead / L-bead (buy drywall-j-l-bead)
  • shadow bead (buy drywall-shadow-bead)
  • tape and finish beyond bead

Build-up

Labor 0.085 hr × $55.00 wage and burden
$4.68
Material and small tools
$0.91
Direct rate (labor, material, and tools)
$5.59 / LF
Overhead 10% of direct
$0.56
Fee 10% of (direct and overhead)
$0.62
Loaded rate
$6.77 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.