Metal stud partition 25ga
$11.84 / LF
DW-041 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is framing one linear foot of 25-gauge metal stud partition (track and studs amortized along the wall run). The carpenter cuts and fastens track and studs ready for hang. The rate is per linear foot of partition run. 20-ga partition, double track, kickers, and hang are separate units.
Includes
- 25-ga metal studs and track with 5% waste
- fasteners
- cut, set track, and install studs
- small tools
Excludes
- 20-ga metal stud partition (buy metal-stud-partition-20ga)
- double deflection track (buy metal-stud-track-double)
- metal stud kickers (buy metal-stud-kickers)
- drywall hang
Build-up
- Labor 0.11 hr × $55.00 wage and burden
- $6.05
- Material and small tools
- $3.73
- Direct rate (labor, material, and tools)
- $9.78 / LF
- Overhead 10% of direct
- $0.98
- Fee 10% of (direct and overhead)
- $1.08
- Loaded rate
- $11.84 / LF