Paper-faced corner bead
$7.34 / LF
DW-052 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is installing one linear foot of paper-faced corner bead on prepared commercial gypsum. The carpenter cuts, sets, and embeds the bead ready for finish coats. Metal corner bead, J/L bead, shadow bead, and full tape-and-finish are separate units.
Includes
- paper-faced corner bead with 5% waste
- cut, set, and embed bead
- small tools
Excludes
- metal corner bead; J/L bead; shadow bead; full tape and finish; after-hours
Build-up
- Labor 0.09 hr × $55.00 wage and burden
- $4.95
- Material and small tools
- $1.11
- Direct rate (labor, material, and tools)
- $6.06 / LF
- Overhead 10% of direct
- $0.61
- Fee 10% of (direct and overhead)
- $0.67
- Loaded rate
- $7.34 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
