Paper-faced corner bead

$7.34 / LF

DW-052 · MasterFormat 09 22 00 · LF

What’s in this rate

This unit is installing one linear foot of paper-faced corner bead on prepared commercial gypsum. The carpenter cuts, sets, and embeds the bead ready for finish coats. Metal corner bead, J/L bead, shadow bead, and full tape-and-finish are separate units.

Includes

  • paper-faced corner bead with 5% waste
  • cut, set, and embed bead
  • small tools

Excludes

  • metal corner bead; J/L bead; shadow bead; full tape and finish; after-hours

Build-up

Labor 0.09 hr × $55.00 wage and burden
$4.95
Material and small tools
$1.11
Direct rate (labor, material, and tools)
$6.06 / LF
Overhead 10% of direct
$0.61
Fee 10% of (direct and overhead)
$0.67
Loaded rate
$7.34 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.