Metal stud partition 12ga
$18.79 / LF
DW-075 · MasterFormat 09 22 00 · LF
What’s in this rate
This unit is framing one linear foot of 12-gauge metal-stud partition, with track and studs amortized along the wall run. The carpenter cuts and fastens the framing ready for hang.
Includes
- 12-gauge studs and track with 5% waste plus fasteners
- cut, set track, and install studs
- small tools
Excludes
- drywall hang
- deflection track
- kickers
- backing
- door frames
- engineering
Build-up
- Labor 0.175 hr × $55.00 wage and burden
- $9.62
- Material and small tools
- $5.91
- Direct rate (labor, material, and tools)
- $15.53 / LF
- Overhead 10% of direct
- $1.55
- Fee 10% of (direct and overhead)
- $1.71
- Loaded rate
- $18.79 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
