Pipe bedding and haunch, stone

$68.94 / CY

EW-050 · MasterFormat 31 23 33 · CY

What’s in this rate

This unit covers Pipe bedding and haunch, stone, measured per cubic yard. The crew places #57 stone bedding and haunching around pipe and hand-shapes and compacts it. The rate covers the listed material, labor, and small tools. Trench excavation, pipe, and backfill above the haunch stay on their own units.

Includes

  • #57 stone delivered (1.15 LCY/CCY)
  • place and shape bedding / haunch
  • plate compaction
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • trench excavation
  • pipe / conduit install
  • backfill above haunch
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Operator, 0.05 hr × $52.00
$2.60
Laborer, 0.25 hr × $38.00
$9.50
Material and small tools
$41.52
Equipment, compact excavator ~5–8 t class, 0.05 hr per unit
$2.75
Equipment, vibratory plate compactor, 0.05 hr per unit
$0.60
Direct rate (labor, material, equipment, and tools)
$56.97 / CY
Overhead 10% of direct
$5.70
Fee 10% of (direct and overhead)
$6.27
Loaded rate
$68.94 / CY

Worked extension: 100 CY of commercial pipe bedding and haunch, stone × $68.94 = $6,894.00 loaded for 100 CY. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.