Pipe bedding and haunch, stone
$68.94 / CY
EW-050 · MasterFormat 31 23 33 · CY
What’s in this rate
This unit covers Pipe bedding and haunch, stone, measured per cubic yard. The crew places #57 stone bedding and haunching around pipe and hand-shapes and compacts it. The rate covers the listed material, labor, and small tools. Trench excavation, pipe, and backfill above the haunch stay on their own units.
Includes
- #57 stone delivered (1.15 LCY/CCY)
- place and shape bedding / haunch
- plate compaction
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- trench excavation
- pipe / conduit install
- backfill above haunch
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Operator, 0.05 hr × $52.00
- $2.60
- Laborer, 0.25 hr × $38.00
- $9.50
- Material and small tools
- $41.52
- Equipment, compact excavator ~5–8 t class, 0.05 hr per unit
- $2.75
- Equipment, vibratory plate compactor, 0.05 hr per unit
- $0.60
- Direct rate (labor, material, equipment, and tools)
- $56.97 / CY
- Overhead 10% of direct
- $5.70
- Fee 10% of (direct and overhead)
- $6.27
- Loaded rate
- $68.94 / CY
Worked extension: 100 CY of commercial pipe bedding and haunch, stone × $68.94 = $6,894.00 loaded for 100 CY. Quantity is a worked extension.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
