Joist bridging bolted diagonal

$12.30 / LF

SS-D1-010 · MasterFormat 05 21 00 · LF

What’s in this rate

This unit covers Joist bridging bolted diagonal, measured per linear foot. The ironworker installs bolted diagonal or X bridging for open-web steel joists where erection-stability bolting is required. The rate covers the listed material, 5.00% material waste, labor, and small tools. Welded/clip diagonal bridging, horizontal bridging, joist install, and metal-stud bridging are separate units.

Includes

  • bolted diagonal bridging angles
  • bridging bolts
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • joist-bridging-diagonal (live) / joist-bridging-horizontal
  • open-web joist install
  • metal-stud-bridging-* (drywall)
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.1 hr × $58.00 wage and burden
$5.80
Material and small tools
$4.36
Direct rate (labor, material, and tools)
$10.16 / LF
Overhead 10% of direct
$1.02
Fee 10% of (direct and overhead)
$1.12
Loaded rate
$12.30 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.