Masonry grout place

$45.57 / CF

MS-030 · MasterFormat 04 05 16 · CF

What’s in this rate

This unit covers Masonry grout place, measured per cubic foot. The bricklayer places fine or coarse masonry grout into CMU or brick cells and consolidates the pour. The rate covers the listed material, 3.00% material waste, labor, and small tools. cmu-grout-filled-cell, concrete-nonshrink-grout, vertical rebar in CMU, CMU cleanout are separate units.

Includes

  • masonry grout (fine or coarse as scoped)
  • placement and consolidation in cells
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • concrete-nonshrink-grout
  • CMU / brick wall lay
  • rebar placement
  • cleanouts after final grout
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.35 hr × $52.00 wage and burden
$18.20
Material and small tools
$19.46
Direct rate (labor, material, and tools)
$37.66 / CF
Overhead 10% of direct
$3.77
Fee 10% of (direct and overhead)
$4.14
Loaded rate
$45.57 / CF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.