Sack rub CMU
$6.25 / SF
MS-029 · MasterFormat 04 05 13 · SF
What’s in this rate
This unit covers Sack rub CMU, measured per square foot. The bricklayer applies a sack or rub finish to exposed CMU and works the surface to a uniform appearance. The rate covers the listed material, 5.00% material waste, labor, and small tools. paint-cmu finishes, concrete-rubbed-finish, masonry parging, CMU wall lay are separate units.
Includes
- sack or rub coat materials
- application and rubbing of exposed CMU
- layout and installation described above
- stated material waste and small tools
Excludes
- paint-cmu-* coatings
- concrete-rubbed-finish
- masonry parging as thicker coat
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.08 hr × $52.00 wage and burden
- $4.16
- Material and small tools
- $1.00
- Direct rate (labor, material, and tools)
- $5.16 / SF
- Overhead 10% of direct
- $0.52
- Fee 10% of (direct and overhead)
- $0.57
- Loaded rate
- $6.25 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
