Mortar net cavity

$9.79 / LF

MS-031 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Mortar net cavity, measured per linear foot. The bricklayer places mortar-collection net at the base of the masonry cavity above the flashing line. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, CMU weep, cavity drainage mat are separate units.

Includes

  • mortar net / mortar collection device
  • placement at cavity base above flashing
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • through-wall flashing
  • weeps
  • full-height cavity drainage mat
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.08 hr × $52.00 wage and burden
$4.16
Material and small tools
$3.93
Direct rate (labor, material, and tools)
$8.09 / LF
Overhead 10% of direct
$0.81
Fee 10% of (direct and overhead)
$0.89
Loaded rate
$9.79 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.