Masonry termination bar

$13.39 / LF

MS-D2-026 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Masonry termination bar, measured per linear foot. The bricklayer installs a termination bar at masonry flashing or membrane edges. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip-edge masonry, roof termination bar / counterflashing are separate units.

Includes

  • termination bar
  • fasteners and sealant allocation light as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • through-wall flashing masonry
  • drip-edge-masonry
  • roof termination bar / counterflashing
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $52.00 wage and burden
$6.24
Material and small tools
$4.82
Direct rate (labor, material, and tools)
$11.06 / LF
Overhead 10% of direct
$1.11
Fee 10% of (direct and overhead)
$1.22
Loaded rate
$13.39 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.