Masonry termination bar
$13.39 / LF
MS-D2-026 · MasterFormat 04 05 23 · LF
What’s in this rate
This unit covers Masonry termination bar, measured per linear foot. The bricklayer installs a termination bar at masonry flashing or membrane edges. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip-edge masonry, roof termination bar / counterflashing are separate units.
Includes
- termination bar
- fasteners and sealant allocation light as scoped
- layout and installation described above
- stated material waste and small tools
Excludes
- through-wall flashing masonry
- drip-edge-masonry
- roof termination bar / counterflashing
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $52.00 wage and burden
- $6.24
- Material and small tools
- $4.82
- Direct rate (labor, material, and tools)
- $11.06 / LF
- Overhead 10% of direct
- $1.11
- Fee 10% of (direct and overhead)
- $1.22
- Loaded rate
- $13.39 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
