Limestone banding

$71.23 / LF

MS-D2-027 · MasterFormat 04 40 00 · LF

What’s in this rate

This unit covers Limestone banding, measured per linear foot. The bricklayer sets a natural limestone horizontal banding course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone banding, limestone veneer, limestone sill, limestone coping are separate units.

Includes

  • natural limestone banding units
  • setting mortar / bedding
  • shims and tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cast-stone banding
  • limestone veneer field
  • limestone sill
  • limestone coping
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.48 hr × $52.00 wage and burden
$24.96
Material and small tools
$33.90
Direct rate (labor, material, and tools)
$58.86 / LF
Overhead 10% of direct
$5.89
Fee 10% of (direct and overhead)
$6.48
Loaded rate
$71.23 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.