Limestone banding
$71.23 / LF
MS-D2-027 · MasterFormat 04 40 00 · LF
What’s in this rate
This unit covers Limestone banding, measured per linear foot. The bricklayer sets a natural limestone horizontal banding course with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone banding, limestone veneer, limestone sill, limestone coping are separate units.
Includes
- natural limestone banding units
- setting mortar / bedding
- shims and tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- cast-stone banding
- limestone veneer field
- limestone sill
- limestone coping
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.48 hr × $52.00 wage and burden
- $24.96
- Material and small tools
- $33.90
- Direct rate (labor, material, and tools)
- $58.86 / LF
- Overhead 10% of direct
- $5.89
- Fee 10% of (direct and overhead)
- $6.48
- Loaded rate
- $71.23 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
