Masonry rope weep

$6.34 / EA

MS-D-021 · MasterFormat 04 05 23 · EA

What’s in this rate

This unit covers Masonry rope weep, measured per each. The bricklayer installs a cotton, rope, or cellular weep in the masonry cavity at the flashing line. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU weep, brick weep, through-wall flashing masonry, mortar net are separate units.

Includes

  • cotton / rope / cellular weep
  • placement in masonry cavity at flashing line
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cmu-weep / brick-weep tube or open head
  • through-wall flashing
  • mortar net
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.07 hr × $52.00 wage and burden
$3.64
Material and small tools
$1.60
Direct rate (labor, material, and tools)
$5.24 / EA
Overhead 10% of direct
$0.52
Fee 10% of (direct and overhead)
$0.58
Loaded rate
$6.34 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.