Masonry rope weep
$6.34 / EA
MS-D-021 · MasterFormat 04 05 23 · EA
What’s in this rate
This unit covers Masonry rope weep, measured per each. The bricklayer installs a cotton, rope, or cellular weep in the masonry cavity at the flashing line. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU weep, brick weep, through-wall flashing masonry, mortar net are separate units.
Includes
- cotton / rope / cellular weep
- placement in masonry cavity at flashing line
- layout and installation described above
- stated material waste and small tools
Excludes
- cmu-weep / brick-weep tube or open head
- through-wall flashing
- mortar net
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.07 hr × $52.00 wage and burden
- $3.64
- Material and small tools
- $1.60
- Direct rate (labor, material, and tools)
- $5.24 / EA
- Overhead 10% of direct
- $0.52
- Fee 10% of (direct and overhead)
- $0.58
- Loaded rate
- $6.34 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
