Masonry flashing end dam
$13.41 / EA
MS-D-020 · MasterFormat 04 05 23 · EA
What’s in this rate
This unit covers Masonry flashing end dam, measured per each. The bricklayer forms or installs an end dam at the masonry through-wall flashing termination. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip edge masonry, roof counterflashing are separate units.
Includes
- end dam at masonry through-wall flashing termination
- sealant allocation as scoped
- layout and installation described above
- stated material waste and small tools
Excludes
- through-wall flashing masonry (LF)
- roof counterflashing
- drip-edge-masonry
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.12 hr × $52.00 wage and burden
- $6.24
- Material and small tools
- $4.84
- Direct rate (labor, material, and tools)
- $11.08 / EA
- Overhead 10% of direct
- $1.11
- Fee 10% of (direct and overhead)
- $1.22
- Loaded rate
- $13.41 / EA