Masonry flashing end dam

$13.41 / EA

MS-D-020 · MasterFormat 04 05 23 · EA

What’s in this rate

This unit covers Masonry flashing end dam, measured per each. The bricklayer forms or installs an end dam at the masonry through-wall flashing termination. The rate covers the listed material, 5.00% material waste, labor, and small tools. through-wall flashing masonry, drip edge masonry, roof counterflashing are separate units.

Includes

  • end dam at masonry through-wall flashing termination
  • sealant allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • through-wall flashing masonry (LF)
  • roof counterflashing
  • drip-edge-masonry
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $52.00 wage and burden
$6.24
Material and small tools
$4.84
Direct rate (labor, material, and tools)
$11.08 / EA
Overhead 10% of direct
$1.11
Fee 10% of (direct and overhead)
$1.22
Loaded rate
$13.41 / EA

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.