Masonry weep vents

$10.41 / LF

MS-D3-025 · MasterFormat 04 05 23 · LF

What’s in this rate

This unit covers Masonry weep vents, measured per linear foot. The bricklayer installs masonry weep vents at the cavity base. The rate covers the listed material, 5.00% material waste, labor, and small tools. brick weep, CMU weep, masonry weep rope, mortar net are separate units.

Includes

  • specified mortar or grout / flashing / weep material
  • mixing and placement described above
  • stated material waste and small tools

Excludes

  • brick-weep
  • cmu-weep
  • masonry-weep-rope
  • mortar-net
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.1 hr × $52.00 wage and burden
$5.20
Material and small tools
$3.40
Direct rate (labor, material, and tools)
$8.60 / LF
Overhead 10% of direct
$0.86
Fee 10% of (direct and overhead)
$0.95
Loaded rate
$10.41 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.