Metal deck floor 3 in composite

$5.90 / SF

SS-D1-013 · MasterFormat 05 31 00 · SF

What’s in this rate

This unit covers Metal deck floor 3 in composite, measured per square foot. The ironworker places and fastens 3-inch composite floor metal deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. 2 in and 1.5 in composite deck, roof decks, pour stop, sidelap, shear studs, and slab concrete are separate units.

Includes

  • 3 in composite floor metal deck
  • fastener share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal-deck-floor-2-composite (live) / -15-composite
  • metal-deck-roof-* / cellular
  • metal-deck-pour-stop / sidelap-fasten
  • shear-stud-weld
  • concrete slab / concrete-metal-pan-deck-fill
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.028 hr × $58.00 wage and burden
$1.62
Material and small tools
$3.25
Direct rate (labor, material, and tools)
$4.87 / SF
Overhead 10% of direct
$0.49
Fee 10% of (direct and overhead)
$0.54
Loaded rate
$5.90 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.