Metal deck floor 1.5 in composite
$4.54 / SF
SS-D1-014 · MasterFormat 05 31 00 · SF
What’s in this rate
This unit covers Metal deck floor 1.5 in composite, measured per square foot. The ironworker places and fastens 1.5-inch composite floor metal deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. 2 in and 3 in composite deck, roof decks, pour stop, sidelap, shear studs, and slab concrete are separate units.
Includes
- 1.5 in composite floor metal deck
- fastener share
- layout and installation described above
- stated material waste and small tools
Excludes
- metal-deck-floor-2-composite (live) / -3-composite
- metal-deck-roof-15-b (roof B-deck, not composite)
- metal-deck-pour-stop / sidelap-fasten
- shear-stud-weld
- concrete slab / concrete-metal-pan-deck-fill
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.022 hr × $58.00 wage and burden
- $1.28
- Material and small tools
- $2.47
- Direct rate (labor, material, and tools)
- $3.75 / SF
- Overhead 10% of direct
- $0.38
- Fee 10% of (direct and overhead)
- $0.41
- Loaded rate
- $4.54 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
