Metal deck floor 1.5 in composite

$4.54 / SF

SS-D1-014 · MasterFormat 05 31 00 · SF

What’s in this rate

This unit covers Metal deck floor 1.5 in composite, measured per square foot. The ironworker places and fastens 1.5-inch composite floor metal deck. The rate covers the listed material, 5.00% material waste, labor, and small tools. 2 in and 3 in composite deck, roof decks, pour stop, sidelap, shear studs, and slab concrete are separate units.

Includes

  • 1.5 in composite floor metal deck
  • fastener share
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • metal-deck-floor-2-composite (live) / -3-composite
  • metal-deck-roof-15-b (roof B-deck, not composite)
  • metal-deck-pour-stop / sidelap-fasten
  • shear-stud-weld
  • concrete slab / concrete-metal-pan-deck-fill
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.022 hr × $58.00 wage and burden
$1.28
Material and small tools
$2.47
Direct rate (labor, material, and tools)
$3.75 / SF
Overhead 10% of direct
$0.38
Fee 10% of (direct and overhead)
$0.41
Loaded rate
$4.54 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.