Reglet counterflashing
$34.65 / LF
RF-027 · MasterFormat 07 62 00 · LF
What’s in this rate
This unit is installing reglet counterflashing at a wall. The crew cuts, fits, and fastens the counterflashing in the reglet. The rate is per linear foot. TPO flashing, termination bar, and wall repair are separate units.
Includes
- Reglet counterflashing
- Cut, fit, and fasten at the wall
- Small tools
Excludes
- TPO flashing
- Termination bar
- Wall repair
Build-up
- Labor 0.2 hr × $65.00 wage and burden
- $13.00
- Material and small tools
- $15.64
- Direct rate (labor, material, and tools)
- $28.64 / LF
- Overhead 10% of direct
- $2.86
- Fee 10% of (direct and overhead)
- $3.15
- Loaded rate
- $34.65 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
