Reglet counterflashing

$34.65 / LF

RF-027 · MasterFormat 07 62 00 · LF

What’s in this rate

This unit is installing reglet counterflashing at a wall. The crew cuts, fits, and fastens the counterflashing in the reglet. The rate is per linear foot. TPO flashing, termination bar, and wall repair are separate units.

Includes

  • Reglet counterflashing
  • Cut, fit, and fasten at the wall
  • Small tools

Excludes

  • TPO flashing
  • Termination bar
  • Wall repair

Build-up

Labor 0.2 hr × $65.00 wage and burden
$13.00
Material and small tools
$15.64
Direct rate (labor, material, and tools)
$28.64 / LF
Overhead 10% of direct
$2.86
Fee 10% of (direct and overhead)
$3.15
Loaded rate
$34.65 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.