Wall termination bar

$14.05 / LF

Wall termination bar · MasterFormat 07 54 23 · LF

What’s in this rate

This unit is installing aluminum termination bar at a wall or curb base. The crew aligns the prepunched bar, drills and anchors it at six inches on center, and applies a continuous termination sealant bead. The rate is per linear foot. Membrane base flashing and substrate repair are separate units. Anchor type has to match the substrate, and membrane contact needs a compatible sealant detail.

Includes

  • Aluminum termination bar
  • Masonry anchors at 6 inches on center
  • Termination sealant bead
  • Layout, drilling, fastening, and cleanup
  • Small tools

Excludes

  • Membrane flashing
  • Counterflashing
  • Damaged masonry repair
  • Wood blocking
  • Hazardous-material controls

Build-up

Labor 0.14 hr × $65.00 wage and burden
$9.10
Material and small tools
$2.51
Direct rate (labor, material, and tools)
$11.61 / LF
Overhead 10% of direct
$1.16
Fee 10% of (direct and overhead)
$1.28
Loaded rate
$14.05 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.