TPO flashing

$21.90 / LF

TPO flashing · MasterFormat 07 54 23 · LF

What’s in this rate

This unit is installing TPO flashing at walls and curbs. The crew cuts the 12-inch flashing, turns it up the vertical, and heat-welds it to the field sheet. The rate is per linear foot of flashing. Premolded boots, field TPO, and edge metal are separate units.

Includes

  • 60-mil non-reinforced TPO flashing, 12-inch
  • Cut, fit, and heat-weld at walls and curbs
  • Small tools

Excludes

  • Field TPO membrane
  • Premolded pipe boots
  • Edge metal
  • Termination bar and sealant as a separate takeoff

Build-up

Labor 0.2 hr × $65.00 wage and burden
$13.00
Material and small tools
$5.10
Direct rate (labor, material, and tools)
$18.10 / LF
Overhead 10% of direct
$1.81
Fee 10% of (direct and overhead)
$1.99
Loaded rate
$21.90 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.