Brick coping
$41.35 / LF
MS-D-019 · MasterFormat 04 21 00 · LF
What’s in this rate
This unit covers Brick coping, measured per linear foot. The bricklayer sets a brick coping course at the wall top with mortar bedding and tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. stone-coping-masonry, cast-stone-coping, coping-metal-cap, roof-coping-* are separate units.
Includes
- brick coping course units
- mortar bedding
- joint tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- stone-coping-masonry
- cast-stone-coping
- coping-metal-cap / roof-coping-* / parapet-coping
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.4 hr × $52.00 wage and burden
- $20.80
- Material and small tools
- $13.37
- Direct rate (labor, material, and tools)
- $34.17 / LF
- Overhead 10% of direct
- $3.42
- Fee 10% of (direct and overhead)
- $3.76
- Loaded rate
- $41.35 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
