Cast stone header
$78.22 / LF
MS-D2-030 · MasterFormat 04 72 00 · LF
What’s in this rate
This unit covers Cast stone header, measured per linear foot. The bricklayer sets a cast-stone header over the masonry opening with bedding and tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone sill, cast-stone banding, cast-stone coping, steel-lintel-masonry-set, precast-lintel-masonry-set, concrete-lintel-pour are separate units.
Includes
- cast-stone header units
- setting mortar / bedding
- shims and tooling over opening
- layout and installation described above
- stated material waste and small tools
Excludes
- cast-stone sill / banding / coping
- steel-lintel-masonry-set
- precast-lintel-masonry-set
- concrete-lintel-pour
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.55 hr × $52.00 wage and burden
- $28.60
- Material and small tools
- $36.05
- Direct rate (labor, material, and tools)
- $64.65 / LF
- Overhead 10% of direct
- $6.46
- Fee 10% of (direct and overhead)
- $7.11
- Loaded rate
- $78.22 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
