Cast stone header

$78.22 / LF

MS-D2-030 · MasterFormat 04 72 00 · LF

What’s in this rate

This unit covers Cast stone header, measured per linear foot. The bricklayer sets a cast-stone header over the masonry opening with bedding and tooling. The rate covers the listed material, 5.00% material waste, labor, and small tools. cast-stone sill, cast-stone banding, cast-stone coping, steel-lintel-masonry-set, precast-lintel-masonry-set, concrete-lintel-pour are separate units.

Includes

  • cast-stone header units
  • setting mortar / bedding
  • shims and tooling over opening
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • cast-stone sill / banding / coping
  • steel-lintel-masonry-set
  • precast-lintel-masonry-set
  • concrete-lintel-pour
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.55 hr × $52.00 wage and burden
$28.60
Material and small tools
$36.05
Direct rate (labor, material, and tools)
$64.65 / LF
Overhead 10% of direct
$6.46
Fee 10% of (direct and overhead)
$7.11
Loaded rate
$78.22 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.