Sandstone veneer
$54.68 / SF
MS-D2-029 · MasterFormat 04 40 00 · SF
What’s in this rate
This unit covers Sandstone veneer, measured per square foot. The bricklayer lays sandstone wall veneer with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. limestone veneer, ashlar stone veneer, granite veneer, rubble stone veneer, stone-*-floor are separate units.
Includes
- sandstone wall veneer units
- setting mortar allocation
- layout and joint tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- limestone / ashlar / granite / rubble veneer
- stone-*-floor (flooring hub)
- ties beyond light allocation
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.42 hr × $52.00 wage and burden
- $21.84
- Material and small tools
- $23.35
- Direct rate (labor, material, and tools)
- $45.19 / SF
- Overhead 10% of direct
- $4.52
- Fee 10% of (direct and overhead)
- $4.97
- Loaded rate
- $54.68 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
