Masonry louver buck

$105.75 / EA

MS-D2-031 · MasterFormat 04 05 23 · EA

What’s in this rate

This unit covers Masonry louver buck, measured per each. The bricklayer builds a masonry buck for a louver opening plumb and square. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry door buck, masonry window buck, masonry storefront buck, louver equipment install are separate units.

Includes

  • buck / frame build-out materials in masonry louver opening
  • mortar and fasteners allocation
  • layout plumb/square
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • masonry-door-buck
  • masonry-window-buck
  • masonry-storefront-buck
  • louver equipment install
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 1.1 hr × $52.00 wage and burden
$57.20
Material and small tools
$30.20
Direct rate (labor, material, and tools)
$87.40 / EA
Overhead 10% of direct
$8.74
Fee 10% of (direct and overhead)
$9.61
Loaded rate
$105.75 / EA