Granite coping

$95.81 / LF

MS-D3-029 · MasterFormat 04 41 00 · LF

What’s in this rate

This unit covers Granite coping, measured per linear foot. The bricklayer sets natural granite coping on the masonry wall. The rate covers the listed material, 5.00% material waste, labor, and small tools. granite veneer, limestone coping, cast-stone coping, metal roof coping are separate units.

Includes

  • stone / cast-stone / cultured-stone units as specified
  • mortar allocation as specified
  • setting and tooling described above
  • stated material waste and small tools

Excludes

  • granite-veneer
  • limestone-coping
  • cast-stone-coping
  • coping-metal-cap / roof-coping-*
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.55 hr × $52.00 wage and burden
$28.60
Material and small tools
$50.58
Direct rate (labor, material, and tools)
$79.18 / LF
Overhead 10% of direct
$7.92
Fee 10% of (direct and overhead)
$8.71
Loaded rate
$95.81 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.