CMU cleanout

$43.37 / EA

MS-011 · MasterFormat 04 22 00 · EA

What’s in this rate

This unit covers CMU cleanout, measured per each. The bricklayer forms or sets a masonry cleanout opening in the CMU wall for cell inspection and grouting access. The rate covers the listed material, 5.00% material waste, labor, and small tools. plumbing cleanout, masonry grout place, CMU wall lay are separate units.

Includes

  • cleanout block or framed masonry cleanout opening
  • mortar and closure hardware allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • plumbing cleanout-* fixtures
  • grout placement after inspection
  • wall lay beyond the cleanout opening
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.4 hr × $52.00 wage and burden
$20.80
Material and small tools
$15.05
Direct rate (labor, material, and tools)
$35.85 / EA
Overhead 10% of direct
$3.58
Fee 10% of (direct and overhead)
$3.94
Loaded rate
$43.37 / EA