CMU cleanout
$43.37 / EA
MS-011 · MasterFormat 04 22 00 · EA
What’s in this rate
This unit covers CMU cleanout, measured per each. The bricklayer forms or sets a masonry cleanout opening in the CMU wall for cell inspection and grouting access. The rate covers the listed material, 5.00% material waste, labor, and small tools. plumbing cleanout, masonry grout place, CMU wall lay are separate units.
Includes
- cleanout block or framed masonry cleanout opening
- mortar and closure hardware allocation as scoped
- layout and installation described above
- stated material waste and small tools
Excludes
- plumbing cleanout-* fixtures
- grout placement after inspection
- wall lay beyond the cleanout opening
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.4 hr × $52.00 wage and burden
- $20.80
- Material and small tools
- $15.05
- Direct rate (labor, material, and tools)
- $35.85 / EA
- Overhead 10% of direct
- $3.58
- Fee 10% of (direct and overhead)
- $3.94
- Loaded rate
- $43.37 / EA