Control joint in CMU

$11.03 / LF

MS-012 · MasterFormat 04 22 00 · LF

What’s in this rate

This unit covers Control joint in CMU, measured per linear foot. The bricklayer forms a vertical control joint in the CMU wall and installs the scoped gasket or filler. The rate covers the listed material, 5.00% material waste, labor, and small tools. masonry control joint gasket, brick expansion joint, drywall/concrete control joints are separate units.

Includes

  • vertical control joint cut/slot in CMU
  • premolded gasket or filler allocation as scoped
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • drywall control joint
  • concrete control joint
  • brick expansion joint
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.12 hr × $52.00 wage and burden
$6.24
Material and small tools
$2.88
Direct rate (labor, material, and tools)
$9.12 / LF
Overhead 10% of direct
$0.91
Fee 10% of (direct and overhead)
$1.00
Loaded rate
$11.03 / LF