CMU column enclosure

$21.87 / SF

MS-D2-005 · MasterFormat 04 22 00 · SF

What’s in this rate

This unit covers CMU column enclosure, measured per square foot. The bricklayer builds a CMU enclosure around a structural column with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU pier, CMU pilaster, field CMU wall, structural steel column fab are separate units.

Includes

  • CMU units for column enclosure
  • Type S mortar
  • plumb and joint tooling
  • layout and installation described above
  • stated material waste and small tools

Excludes

  • freestanding CMU pier
  • CMU pilaster
  • structural steel column fab
  • grout / rebar
  • cap / coping
  • tax / freight
  • after-hours, premium access, and hazardous-material handling

Build-up

Labor 0.22 hr × $52.00 wage and burden
$11.44
Material and small tools
$6.63
Direct rate (labor, material, and tools)
$18.07 / SF
Overhead 10% of direct
$1.81
Fee 10% of (direct and overhead)
$1.99
Loaded rate
$21.87 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.