CMU column enclosure
$21.87 / SF
MS-D2-005 · MasterFormat 04 22 00 · SF
What’s in this rate
This unit covers CMU column enclosure, measured per square foot. The bricklayer builds a CMU enclosure around a structural column with tooled joints. The rate covers the listed material, 5.00% material waste, labor, and small tools. CMU pier, CMU pilaster, field CMU wall, structural steel column fab are separate units.
Includes
- CMU units for column enclosure
- Type S mortar
- plumb and joint tooling
- layout and installation described above
- stated material waste and small tools
Excludes
- freestanding CMU pier
- CMU pilaster
- structural steel column fab
- grout / rebar
- cap / coping
- tax / freight
- after-hours, premium access, and hazardous-material handling
Build-up
- Labor 0.22 hr × $52.00 wage and burden
- $11.44
- Material and small tools
- $6.63
- Direct rate (labor, material, and tools)
- $18.07 / SF
- Overhead 10% of direct
- $1.81
- Fee 10% of (direct and overhead)
- $1.99
- Loaded rate
- $21.87 / SF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
