Core wall form

$17.34 / SF

CN-183 · MasterFormat 03 11 00 · SF

What’s in this rate

This unit is forming one square foot of concrete core-wall face at a prepared wall line. The cement mason cuts, aligns, braces, and strips forms for the core-wall assembly. Concrete placement, reinforcing steel, embeds, and engineered shoring are separate units.

Includes

  • reusable form-face and lumber allowance
  • ties, braces, and fasteners
  • cut, align, brace, and strip core-wall form
  • small tools

Excludes

  • concrete placement
  • reinforcing steel
  • engineered shoring
  • waterproofing
  • embeds
  • surveying

Build-up

Labor 0.215 hr × $48.00 wage and burden
$10.32
Material and small tools
$4.01
Direct rate (labor, material, and tools)
$14.33 / SF
Overhead 10% of direct
$1.43
Fee 10% of (direct and overhead)
$1.58
Loaded rate
$17.34 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.