Dock apron pour

$15.33 / SF

CN-179 · MasterFormat 03 30 00 · SF

What’s in this rate

This unit is placing one square foot of concrete dock apron at a prepared loading area. The cement mason forms, places, consolidates, and finishes the apron. Excavation, dock leveler pit, dock wall, approach paving, and equipment embeds are separate units.

Includes

  • ready-mix concrete and form allowance
  • joint and curing-material allowance
  • place, consolidate, and finish dock apron
  • small tools

Excludes

  • excavation
  • dock leveler pit
  • dock wall
  • approach paving
  • equipment embeds

Build-up

Labor 0.145 hr × $48.00 wage and burden
$6.96
Material and small tools
$5.71
Direct rate (labor, material, and tools)
$12.67 / SF
Overhead 10% of direct
$1.27
Fee 10% of (direct and overhead)
$1.39
Loaded rate
$15.33 / SF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.