Dock leveler pit form

$21.66 / LF

CN-164 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting one linear foot of dock-leveler pit form at a prepared pit line. The cement mason aligns, braces, and strips the pit form. Concrete placement, reinforcement, dock-leveler equipment, embeds, and engineered shoring are separate units.

Includes

  • reusable plywood and lumber allowance
  • ties, braces, and release agent
  • set, plumb, brace, and strip leveler-pit form
  • small tools

Excludes

  • concrete placement
  • reinforcing steel
  • dock leveler equipment
  • embeds and angles
  • engineered shoring
  • waterproofing

Build-up

Labor 0.24 hr × $48.00 wage and burden
$11.52
Material and small tools
$6.38
Direct rate (labor, material, and tools)
$17.90 / LF
Overhead 10% of direct
$1.79
Fee 10% of (direct and overhead)
$1.97
Loaded rate
$21.66 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.