Mechanical rebar dowel
$17.94 / EA
CN-165 · MasterFormat 03 60 00 · EA
What’s in this rate
This unit is installing one mechanical rebar dowel coupler assembly at prepared bar ends. The cement mason prepares the bars, couples, and sets the dowel. Engineering, epoxy-set dowels, surrounding reinforcement, and proof testing are separate units.
Includes
- mechanical coupler and cut rebar dowel
- installation grease and alignment allowance
- prepare bar ends, couple, and set dowel
- small tools
Excludes
- engineering and layout
- epoxy-set dowel
- reinforcing steel beyond dowel
- concrete repair
- proof testing
- special inspection
Build-up
- Labor 0.14 hr × $48.00 wage and burden
- $6.72
- Material and small tools
- $8.11
- Direct rate (labor, material, and tools)
- $14.83 / EA
- Overhead 10% of direct
- $1.48
- Fee 10% of (direct and overhead)
- $1.63
- Loaded rate
- $17.94 / EA
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
