Stem wall form

$17.38 / LF

CN-166 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting one linear foot of stem-wall form at a prepared foundation line. The cement mason aligns, braces, and strips the form. Concrete placement, reinforcement, footing pours, waterproofing, and engineered shoring are separate units.

Includes

  • reusable plywood and lumber allowance
  • ties, braces, and release agent
  • set, plumb, brace, and strip stem-wall form
  • small tools

Excludes

  • concrete placement
  • reinforcing steel
  • footing pour
  • waterproofing
  • engineered shoring
  • embeds

Build-up

Labor 0.2 hr × $48.00 wage and burden
$9.60
Material and small tools
$4.76
Direct rate (labor, material, and tools)
$14.36 / LF
Overhead 10% of direct
$1.44
Fee 10% of (direct and overhead)
$1.58
Loaded rate
$17.38 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.