Machine base place

$171.07 / EA

CN-069 · MasterFormat 03 30 00 · EA

What’s in this rate

This unit is placing one machine or equipment concrete base. The cement mason forms, places, and finishes the base ready for cure and equipment set. The rate is per each base. Housekeeping pads, elevated equipment pads, and transformer pads are separate units.

Includes

  • ready-mix concrete for typical machine base (~0.32 CY) with 5% waste
  • form lumber share amortized
  • place, consolidate, and finish
  • small tools

Excludes

  • housekeeping pad (buy concrete-housekeeping-pad)
  • elevated equipment pad (buy concrete-equipment-pad-elevated)
  • transformer pad (buy concrete-transformer-pad)
  • anchor bolts / embeds

Build-up

Labor 1.4 hr × $48.00 wage and burden
$67.20
Material and small tools
$74.18
Direct rate (labor, material, and tools)
$141.38 / EA
Overhead 10% of direct
$14.14
Fee 10% of (direct and overhead)
$15.55
Loaded rate
$171.07 / EA