Trench drain grate frame
$12.37 / LF
CN-128 · MasterFormat 03 11 00 · LF
What’s in this rate
This unit is setting one linear foot of form/frame support for a prepared trench-drain grate. The cement mason cuts, aligns, braces, and secures the frame ready for adjacent concrete and grate placement.
Includes
- grate-frame/form share with 5% waste
- braces and fasteners
- cut, align, brace, and secure frame
- small tools
Excludes
- drain body
- grate
- excavation
- concrete placement
- rebar
- testing
Build-up
- Labor 0.115 hr × $48.00 wage and burden
- $5.52
- Material and small tools
- $4.71
- Direct rate (labor, material, and tools)
- $10.23 / LF
- Overhead 10% of direct
- $1.02
- Fee 10% of (direct and overhead)
- $1.12
- Loaded rate
- $12.37 / LF
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
