Trench drain grate frame

$12.37 / LF

CN-128 · MasterFormat 03 11 00 · LF

What’s in this rate

This unit is setting one linear foot of form/frame support for a prepared trench-drain grate. The cement mason cuts, aligns, braces, and secures the frame ready for adjacent concrete and grate placement.

Includes

  • grate-frame/form share with 5% waste
  • braces and fasteners
  • cut, align, brace, and secure frame
  • small tools

Excludes

  • drain body
  • grate
  • excavation
  • concrete placement
  • rebar
  • testing

Build-up

Labor 0.115 hr × $48.00 wage and burden
$5.52
Material and small tools
$4.71
Direct rate (labor, material, and tools)
$10.23 / LF
Overhead 10% of direct
$1.02
Fee 10% of (direct and overhead)
$1.12
Loaded rate
$12.37 / LF

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.