Inlet protection, curb inlet

$69.40 / EA

EW-009 · MasterFormat 31 25 13 · EA

What’s in this rate

This unit covers Inlet protection, curb inlet, measured per each. The laborer places a sediment log or filled gravel bags across an existing curb inlet opening. The rate covers the listed material, labor, and small tools. Grate-inlet protection, silt fence, and SWPPP maintenance stay on their own units.

Includes

  • curb-inlet sediment log ~6–8 ft or 4–6 gravel bags
  • place across curb opening
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • SWPPP plan preparation, inspections, reporting, and permit fees
  • maintenance, sediment cleanout, and removal at project end
  • storm inlet / structure construction
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Laborer, 0.4 hr × $38.00
$15.20
Material and small tools
$42.15
Direct rate (labor, material, and tools)
$57.35 / EA
Overhead 10% of direct
$5.74
Fee 10% of (direct and overhead)
$6.31
Loaded rate
$69.40 / EA

Worked extension: 1 EA of commercial inlet protection, curb inlet × $69.40 = $69.40 loaded for 1 EA. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.