Inlet protection, grate inlet

$84.11 / EA

EW-008 · MasterFormat 31 25 13 · EA

What’s in this rate

This unit covers Inlet protection, grate inlet, measured per each. The laborer fits a filter-bag insert into an existing grate inlet and resets the grate. The rate covers the listed material, labor, and small tools. Curb-inlet protection, silt fence, and SWPPP maintenance stay on their own units.

Includes

  • filter-bag insert sized to ~2x2 ft grate
  • set and reset grate
  • operator and laborer time and equipment listed in the build-up
  • stated material waste and small tools

Excludes

  • SWPPP plan preparation, inspections, reporting, and permit fees
  • maintenance, sediment cleanout, and removal at project end
  • storm inlet / structure construction
  • tax / freight beyond the stated delivered material prices
  • after-hours, premium access, and contaminated / hazardous soil handling
  • geotechnical testing, surveying / staking, and permits

Build-up

Laborer, 0.3 hr × $38.00
$11.40
Material and small tools
$58.11
Direct rate (labor, material, and tools)
$69.51 / EA
Overhead 10% of direct
$6.95
Fee 10% of (direct and overhead)
$7.65
Loaded rate
$84.11 / EA

Worked extension: 1 EA of commercial inlet protection, grate inlet × $84.11 = $84.11 loaded for 1 EA. Quantity is a worked extension.

Use this in a private library

Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.