Inlet protection, grate inlet
$84.11 / EA
EW-008 · MasterFormat 31 25 13 · EA
What’s in this rate
This unit covers Inlet protection, grate inlet, measured per each. The laborer fits a filter-bag insert into an existing grate inlet and resets the grate. The rate covers the listed material, labor, and small tools. Curb-inlet protection, silt fence, and SWPPP maintenance stay on their own units.
Includes
- filter-bag insert sized to ~2x2 ft grate
- set and reset grate
- operator and laborer time and equipment listed in the build-up
- stated material waste and small tools
Excludes
- SWPPP plan preparation, inspections, reporting, and permit fees
- maintenance, sediment cleanout, and removal at project end
- storm inlet / structure construction
- tax / freight beyond the stated delivered material prices
- after-hours, premium access, and contaminated / hazardous soil handling
- geotechnical testing, surveying / staking, and permits
Build-up
- Laborer, 0.3 hr × $38.00
- $11.40
- Material and small tools
- $58.11
- Direct rate (labor, material, and tools)
- $69.51 / EA
- Overhead 10% of direct
- $6.95
- Fee 10% of (direct and overhead)
- $7.65
- Loaded rate
- $84.11 / EA
Worked extension: 1 EA of commercial inlet protection, grate inlet × $84.11 = $84.11 loaded for 1 EA. Quantity is a worked extension.
Related rates
Use this in a private library
Create a free account to keep your own hours, burden, and supplier quotes behind a login. Published rates stay public. Your own hours and quotes stay private.
